 |
Reflecting state-of-the art architectural design, the Nevada State Development Corporation building took five months to complete. It includes a fully sprinkled, wood-framed structure, with multiple architectural features such as a 24-foot tall radius wall, a pyramid-shaped skylight, radius and angled soffits and multiple finish upgrades. |